Cap Project Update: 9/27/25

2023 Capital Improvement Project Update 9/27/25
Dear MACS Family and Community,
Due to recent weather conditions, paving at the Middle School was delayed but will resume as soon as conditions allow. At the High School, window replacement is scheduled to begin next week. Looking ahead to spring and summer, all buildings will receive new windows. Classroom windows will feature dual shades—room darkening and light filtering—as well as screens to improve comfort and functionality.
Thank you for your continued support as we work to improve our facilities for the MACS community.
Dr. Runner, Superintendent
Mexico High School
- Repointing mortar joints
- Repointing cleaning up stair repair material and tools
- Repointing mortar joints in the front of the school upper right corner by the sign
- Installing check valves on the pipes for the condensate tank
Mexico Middle School
- Grading the area around the guard rails prepping for topsoil and seed
- Installing wiring and conduit for lockdown/lockout buttons
- Spreading topsoil getting the areas ready for seed
- Installing wiring in the auditorium for the clocks and strobes.
Palermo Elementary School
- Installing trim metal along the windows to close the gap left behind after the new lentils were installed
- Grinding mortar joints on the chimney
Next Steps
Middle School
- Rear Parking lot base and binder, Top Coat
- Stormwater detention pond seeding
- Site Stairs and railings
- Landscaping
- Gate operator arms
- Signage
- Benches, Basketball hoops
High School
- Attic HVAC replacement
- Masonry Restoration
- Window Replacement
- Area M roofing flashing and coping
- Area L roof counter flashing
Mexico Elementary
- Masonry Restoration
- LED Digital Display Sign
- Window Replacements
New Haven Elementary
- LED Digital Display Sign
- Window Replacements
Palermo Elementary
- Masonry Restoration
- LED Digital Display Sign
- Window Replacements